Qatar Red Line South At-Grade and Metro

Between 2016 and 2018, I worked at the “Free Zone, Ras Bu Fontas, and Al Wakra” at-grade and elevated metro stations on the Qatar Red Line Metro project under the umbrella of Anel Holding. Particularly, experience was gained in mechanical installation topics at the Al Wakra station.

Mechanical installation topics included : fire suppression system (FSS), ventilation (cooling piping), rainwater drainage lines, plumbing, underground hydrants, and main cooling pipe lines. Field applications related to the specified disciplines have been carried out in this project.

Al wakrah Metro station Qatar
Project Type : Metro Transportation
Scope of Work : Mechanical
Total Area : 40.346 m²
Location: Al Wakra - Doha, Katar
Project Start : 2016
Project End : 2018
Employer : Qatar Rail Company
Contractor : FCC-Yüksel-Archirodon-Petroserv JV
Status : Completed.
Additional Information : Al Wakra Metro Station
Qatar Rail Doha Metro