Between 2010 and 2012, I worked for ANEL Group on the CP18 mechanical installation field design and implementation project at the QATAR New Doha International Project. It was involved in the CP110 mechanical installation field design and implementation project between 2012 and 2013.

The mechanical installation piping systems included: fire suppression system (FFS), ventilation (cooling piping), rainwater drainage lines, plumbing, underground hydrants, plumbing lines, and main cooling pipe lines. Field applications related to the specified disciplines have been carried out in this project.

Project Type : Airport Transportation
Scope of Work : Mechanical
Total Area : 680.000 m²
Location : Doha, Katar
Project Start : 2010
Project End : 2013
Employer : NDIA Steering Committee
Contractor : TAV Construction / SOJV
Status : Completed
Additional Information : (CP18-CP29-CP99-CP110-CP111-CP112)