WYNDAM HOTEL KALAMIŞ
Between 2009 and 2010, Akım Engineering worked on the mechanical design of the Wyndham Hotel’s HVAC systems located at Kadikoy Kalamis Marina.
Among the topics of mechanical installation, fire suppression system (FSS), ventilation (cooling pipeline piping), rainwater drainage lines, plumbing and fire smoke evacuation are also included. The smoke exhaust system designs took into account our design criteria by considering variations according to the movable opening and closing walls of the meeting rooms and the number of participants.
In this project, mechanical installation design application drawings have been carried out.
Project Type : | Otel |
Scope of Work : | That's all. |
Total Area : | 15.000 m2 |
Location: | Kadıköy - İstanbul, Türkiye |
Project Start : | 2009 |
Project End : | 2011 |
Employer : | Kalamıs Hotel |
Architecture : | Ali Cicek Architecture |
Status : | Completed. |
Wyndham Kalamış Hotel Introduction